Skip to content
2000

Layout Design of Smart Port

image of Layout Design of Smart Port

The layout design of smart port is evolving. With the introduction of the 4th industrial revolution technology, the productivity of the ACT (Automated Container terminal) is surpassing that of the conventional method. In this chapter, the author focuses on designing the layout of ACT of a case terminal. ACT area is divided into QC (Quay Crane) Set Back, QC Rail span, AGV handling area under QC, AGV road and working area, WSTP (Water Side Transfer Point), CY Block, LSTP (Land Side Transfer Point), support facility and gate facility. The data required for the ACT design is the operation data of the neighboring terminals. The operation data include the container dwell time, max stacking height, CY utilization ratio, working days per year, peaking factor and the throughput by export, import, transshipment. Furthermore, it is necessary to seize the ratio of container by full, empty, reefer, oversize, dangerous container type, TEU conversion ratio and gate transit time, etc. Here, we propose three types of ACT such as Y type, L type and U type. The process of designing these drawings, formula and parameters will be described

/content/books/9789815050417.chap3
dcterms_subject,pub_keyword
-contentType:Journal
10
5
Chapter
content/books/9789815050417
Book
false
en
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error
Please enter a valid_number test